Cut six inches off the length of the first starter shingle nailed on then use the rest of them full size.
How to attach roof shingles.
As mentioned above place the first 6 inches 15 cm of the second layer on top of the first layer.
Handy home shows you universal shingling techniques that can be applied to any shed.
Apply roofing cement and secure the second layer to the roof.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Use the chalk line to snap a straight line vertically every 6 inches.
Get your trowel and another scoop of cement and apply it on the roof below the second chalk line.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Every 5 inches make a new mark until you get to the rop of the roof.
Repeat this on both sides of the roof.
Lay the first row of shingles directly covering the narrow starter row.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Many pros shingle in a vertical line up the roof because it s much faster.
Shingling a shed and want some tips.
Open a pack of three tab shingles.
Once the cement is spread across the roof it s time to place the second layer down.
Repeat this basic pattern alternating shingles across the roof working toward the right side using the chalk line to keep the shingles straight horizontally.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing.
Place these starter strips side by side on the tar with their edges.
Snap a horizontal chalk line over the starting row to use as a guide.
Trim the tabs off of enough of them to cover the length of the roof using a utility knife.