So there is enough gap for air to flow.
How far from the wall should you start your concrete.
Breaking the paper ruins the strength of the attachment.
Here are two videos that do a good job of showing you a better way to build.
Exterior wall on slab videos.
Start the footings with a base layer of tightly compacted gravel.
Concrete fasteners should not be set closer than 10 anchor diameters from each other.
Determine the maximum spacing between joints in feet by multiplying the planned concrete thickness in inches by 2 5.
For 3 4 inch thick drywall use a 1 3 8 inch screws.
Drywall guns have adjustable clutches that allow you to control the depth of the screw bit.
Using sleepers as your posts costs about a third of the price of h beams.
Use a mechanical vibrator when pouring concrete foundations to settle the concrete and eliminate any air pockets which might weaken it.
Use a drywall knife to fill the large gaps with ready mixed joint.
If you are using 1 2 inch thick drywall use 1 1 2 inch long screws or nails.
Sleeper retaining wall posts come in two varieties steel galvanised h beams or a vertical sleepers.
Time now to concrete your posts into position.
Or you can leave a 4 inch gap between the studs and concrete wall and probably get away with it.
That is if the studs are going to touch the concrete wall.
Miscalculate your construction plans and you could end up with a weak wall that risks bulging or worse collapsing altogether.
Most jurisdictions require a 4 mil plastic sheet vapor barrier for basement walls against concrete.
If you ve already installed drywall while letting it rest on the floor all is not lost but you have your work cut out for you.
By far large i like doing it on the ground as it is much easier to get everything lined up glued nailed properly before raising it up.
Place rebar horizontally and vertically in both.
This pressure goes out and up the length of the anchor forming what is commonly called a cone of concrete as it is cone shaped in appearance.
In the first one the homeowner or contractor goes the extra mile and has his wall overhang the edge of the slab by 1 2 inch.
For just this reason retaining walls taller than four feet should.
For example if your wall is going to be 800mm high the holes for your posts should be 500mm deep.
Put footing rebar vertically to extend up into the foundation wall.